Full CT Project Cycles, Documented On Site
Site preparation through commissioning to operational handover — every phase captured as engineering record, not marketing material.













Infrastructure Comes First
Structural readiness, power distribution, and HVAC coordination are planned before a gantry arrives. No installation begins on an unprepared site.
Three Weeks of Coordinated Engineering
Gantry unloading, positioning, alignment, and mechanical integration require sequenced coordination across electrical, structural, and imaging teams — executed to Siemens installation specifications.
Operational Readiness, Not Just a Handover
Commissioning includes system calibration, image quality validation, and operator verification. A room is only handed over when it performs to specification under clinical conditions.
Six Generations of SOMATOM Engineering
SOMATOM go.Now · SOMATOM go.Top · SOMATOM Definition Family
SOMATOM Force · SOMATOM Drive · NAEOTOM Alpha
Multi-generation Siemens installation and commissioning experience — not single-project familiarity. Each platform demands distinct infrastructure specifications; we have delivered all of them.
Planning a CT Deployment?
Bring us the site conditions and the platform specification. We scope the infrastructure, coordinate the installation, and remain on site through commissioning.